Uploading Final Inspection Reports
  • 29 May 2023
  • 1 Minute to read
  • Contributors
  • Dark
    Light

Uploading Final Inspection Reports

  • Dark
    Light

Article summary

Final Inspection Reports should be uploaded to FOSTER on the Master Inspection Record, when they are in final draft

  1. Important points to note
  2. How to upload Final Inspection Reports

1. Important points to note

  • Uploading of reports in foster in the MIR is done for tracking & performance monitoring purposes, but is an essential requirement
  • Only final drafts of reports should be uploaded, in PDF format
  • Include a sensible title for the report - including the following pieces of information:
    • Tender Number
    • Report number/Reference Number
    • Inspected quantity covered by the report
  • After reports are uploaded and all ILAs are cleared and completed by WFP - you MUST send the MIR to the "Evaluation" phase for completion by WFP
  • Follow the video and guidance to report non-conformities correctly

2. How to upload Final Inspection Reports

Follow the video guide to correctly upload final inspection reports:



Was this article helpful?

Changing your password will log you out immediately. Use the new password to log back in.
First name must have atleast 2 characters. Numbers and special characters are not allowed.
Last name must have atleast 1 characters. Numbers and special characters are not allowed.
Enter a valid email
Enter a valid password
Your profile has been successfully updated.