How to read suppliers' survey results
  • 13 Feb 2024
  • 1 Minute to read
  • Contributors
  • Dark
    Light

How to read suppliers' survey results

  • Dark
    Light

Article summary

Results of the Suppliers' survey launched through MoDa can be found under Supplier Feedback Summary tab, which is visible when the specification is under Procurement and Supplier review and under Final Review phases. 

Responses from each supplier are recorded in a log, as per the overview below:

  1.  Round of the survey (a second round can be required sometimes).
  2.  Name of the supplier.
  3.  Sign-Off is marked as 'Yes' if supplier is able to meet the requirements of the new/revised specification.
  4.  Supply impact is marked as 'Yes' if the new/revised specification will have an impact on cost or on lead time.
  5.  Submission date.
  6.  Impact description section states whether any new/revised requirements have an impact on cost and lead time for the supplier, with a description of the impact. This section might also include a grace period requested by the supplier to be able to comply with the new/revised specification.
  7.  This section lists the new/revised requirements which have an impact on cost and lead time.
  8.  The supplier can include a counter-proposal in the survey. It is recorded in this section.
  9.  E-mail address of the supplier.

Was this article helpful?

Changing your password will log you out immediately. Use the new password to log back in.
First name must have atleast 2 characters. Numbers and special characters are not allowed.
Last name must have atleast 1 characters. Numbers and special characters are not allowed.
Enter a valid email
Enter a valid password
Your profile has been successfully updated.